Developing a timetable for radiant and circular transport organization with implementation of the Transportation Requirements Planning method

Marek Fertsch

Abstract


Summary

   This paper contains the results of preliminary research on the use of the Transportation Requirements Planning method to develop a timetable for radial  and circular transport organization. It begins with a discussion on the method of Transportation Requirements Planning. Then the problem of developing a timetable in radial and circular transport is formulated. Successively results obtained by applying of the Transportation Requirements Planning method to develop the timetable under assumed conditions are presented. The summary and discussion of the perspectives for further research are the final part of the paper.

 

Keywords


Transportation requirement planning

Full Text:

PDF

References


Baan = www. Baan-ERP-IV-Transportation-Distribution-Requirements-Planning

Fer, 2003 = Fertsch M., Podstawy zarządzania przepływem materiałów w przykładach, Wydawnictwo Instytutu Logistyki i Magazynowania, Poznań 2003.

Fer, 2013 = Fertsch M., Metoda planowania zapotrzebowania materiałowego w planowaniu produkcji i sterowaniu jej przebiegiem, Wydawnictwo Politechniki Poznańskiej, Poznań 2013.

Joh, 1986 = Johnson J. C., Wood D. F., Contemporary Physical Distribution and Logistics, third edition, Macmillan Publishing Company, New York 1986.

Min, 2014 = Mindur L., (ed.), Technologie transportowe, Wydawnictwo Naukowe Instytutu Technologii Eksploatacji, Radom 2014.

Orl, 1981 = Orlicky J., Planowanie potrzeb materiałowych – nowy styl zarządzania produkcją i zapasami, Państwowe Wydawnictwo Ekonomiczne, Warszawa 1981.

SAP = www. SAP Library - Distribution Requirements Planning (DRP)

Sch, 1994 = Schweigert D., Abt O., Uebersicht ueber Absatz – und Produktionsprogramplanung in PPS- Standardsoftware, "REFA – Nachrichten", 4 (1994).

TRP = www. Transportation Requirements Planning (TRP)


Refbacks

  • There are currently no refbacks.