Time Dependencies in Supply Chain Perfomance Process

Sylwia Werbińska-Wojciechowska

Abstract


The paper focuses on basic time relations within the range of a supply chain. Relations occuring between effective, constant realization of operation task and logistics are determined. Fundamental time delays affecting added value of logistics chain are discussed. On the example of a particular production system evaluation capabilities of particular time parameters are pointed out.


Keywords


logistics ; supply chain

Full Text:

PDF

References


Akbarov A., Christer A. H., Wang W., Problem identification in maintenance modelling: a case study, “International Journal of Production Research”, 46 (2008)/4, pp. 1031-1046.

Bogataj L., Bogataj M., The study of optimal additional investments in capabilities for reduction of delays in value chain, “International Journal of Production Economics”, 108 (2007), pp. 281-290.

Box G. E. P., Jenkins G. M., Time Series Analysis Forecasting and Control, Holden-Day, California 1976.

Christer A. H., Developments in delay time analysis for modelling plant maintenance, “Journal of the Operational Research Society”, 50 (1999), pp. 1120-1137.

Christer A. H., Wang W., Baker R. D., Modelling maintenance practice of production plant using the delay-time concept, “IMA Journal of Mathematics applied in Business and Industry”, (1995)/6, pp. 67-83.

Christer A. H., Wang W., A model of condition monitoring of a production plant, “European Journal of Operational Research”, 30 (1992)/9, pp. 2199- 2211.

Christer A. H., Waller W. M., Delay-time models of industrial inspection maintenance problems, “Journal of the Operational Research Society”, 33 (1984), pp. 401-406.

Christer A. H., Modelling inspection policies for building maintenance, “Journal of the Operational Research Society”, 31 (1982), pp. 723-732.

Desa M. I., Christer A. H., Modelling in the absence of data: a case study of fleet maintenance in a developing country, “Journal of the Operational Research Society”, 52 (2001), pp. 247-260.

Hennet J-C., Tarbouriech S., Stability conditions of constrained delay systems via positive invariance, “International Journal of Robust and Nonlinear Control”, 8 (1998), pp. 265-278.

Kennedy W. J., Patterson J. W., Fredendall L. D, An overview of recent literature on spare parts inventories, “International Journal of Production Economics”, 76 (2002)/2, pp. 201-215.

Mabini M. C., Christer A. H., Controlling multiindenture repairable inventories of multiple aircraft parts, “Journal of the Operational Research Society”, 53 (2002), pp. 1297-1307.

Nowakowski T., Werbińska-Wojciechowska S., Maintenance processes modeling (to be prepared).

Nowakowski T., Werbińska S., Wybrane problemy oceny łańcucha logistycznego, [in:] Wybrane zagadnienia logistyki stosowanej, ed. by Bukowski L., Wydawnictwo Akademii Górniczo-Hutniczej, Kraków 2009.

Pillay A., Wang J., Wall A. D., A maintenance study of fishing vessel equipment using delay-time analysis, “Journal of Quality in Maintenance Engineering”, 7 (2001)/2, pp. 118-127.

Sadananda Upadhya K., Srinivasan N. K., Availability of weapon systems with multiple failures and logistic delays, “International Journals of Quality and Reliability Management”, 20 (2003)/7, pp. 836-846.

Wang W., Christer A. H., Towards a general condition based maintenance model for a stochastic dynamic system, “Journal of the Operational Research Society”, 51 (2000), pp. 145-155.

Werbińska S., Model logistycznego wsparcia systemu eksploatacji środków transportu. Rozprawa doktorska, Politechnika Wrocławska, Wrocław 2008.

Wojnar A., Analiza funkcjonowania systemu dystrybucji dla wybranego przedsiębiorstwa, Praca dyplomowa, Politechnika Wrocławska, Wrocław 2008.


Refbacks

  • There are currently no refbacks.